Multiple sections of the Tube, Overground and Elizabeth line network will be disrupted this weekend (February 8-February 9).
Seventy new Class 345 trains built in Derby will service the Elizabeth Line. They will run along a 62 miles (100km) route, including 25.5 miles (41km) of tunnels and track under London and 36.5 ...
The first plans for what became known as Crossrail (and was subsequently named the Elizabeth Line in 2016) were mooted back in 1974, although plans for major cross-capital train tunnels date back to ...