News

The goal is to work alongside agency staff to identify what is working, what needs improving, and where small changes could lead to big wins for both the public and the regulated community', the RRC ...
RESULTS All cystectomy patients A total of 213 patients who underwent either ORC or RRC procedures between January 2003-December 2013 formed the study cohort, of which 168 (78.9%) were male (Table-1).
RRC SECR Apprentice registration 2025 underway: Check direct link to apply for 1000+ posts here TOI Education / Apr 7, 2025, 11:08 IST ...
PROGRESSIVE VIEWS Texas has a growing number of orphan wells that have not been properly abandoned and are sometimes leaking, causing contamination of ground water and the land around the well. Orphan ...
Most of these pits are authorized automatically under RRC procedures and do not require a permit from the Railroad Commission. The new rule allows drillers to keep the pit open for up to a year ...
RRC Commissioner Jim Wright, who spearheaded the rulemaking, reflected on the multi-year process during the December meeting. “Today I believe the Railroad Commission and the state of Texas have taken ...
Most of these pits are authorized automatically under RRC procedures and do not require a permit from the Railroad Commission. The new rule allows drillers to keep the pit open for up to a year ...
The waste rule, last updated in 1984 and previously housed in Chapter 8 of the RRC rules, covers a wide range of disposal sites for drilling wastes. Texas is now drilling record amounts of oil and ...
Waste pit requirements The waste rule, last updated in 1984 and previously housed in Chapter 8 of the RRC rules, covers a wide range of disposal sites for drilling wastes. Texas is now drilling ...
Texas regulators have completed the first overhaul of oilfield waste rules in over 40 years. The Railroad Commission of Texas (RRC) last month adopted revisions for Chapters 3 and 4 of its rules ...
In a statement posted on its website recently, the Texas Railroad Commission (RRC) announced that it has “adopted a significant overhaul of rules regulating oil and gas waste management ...
The rule updates requirements on the design, construction, operation, monitoring, and closure of waste management units, and will improve the RRC’s ability to track and collect data on oilfield ...