News
Approximately 3,600 gallons of wastewater were spilled at the intersection of Colonial Blvd and Summerlin Rd, according to ...
A recent inspection report from the Tennessee Department of Environment and Conservation reveals that there were several ...
The collapse occurred at the $630.5 million Los Angeles Effluent Outfall Tunnel, part of the Clearwater Project.
The Aliso Creek sewage outfall has been recognized for safe discharge of treated wastewater. The outfall extends 7,900 feet offshore at a depth of 195 feet off Aliso Beach in South Laguna.
A partial collapse in LA’s Clearwater Tunnel trapped 31 workers nearly 450 ft underground; all were rescued safely. Officials cite soft soil and “squeezing ground” as likely contributing factors.
The bottom line for the outfall is a 50-year cost of $28.68 million. The Tidewater option, the consultant said, would cost $39.4 million over the same time frame.
Then, when the outfall pipe began discharging into the bay in 2000, the EPA required the scientific oversight panel in Deer Island’s original wastewater permit, along with stringent effluent ...
PHOTO GALLERY: Over the decades, six plants jettisoned wastewater from outfall pipes in Miami-Dade, Broward and Palm Beach counties, releasing massive clouds that cause the surface to look like it ...
Concerned Citizens alleged that EPA erred in denying its subsequent request to terminate the 2014 NPDES Permit as to Outfall 051. The organization argued that the Laboratory had not discharged ...
While King County’s clean-water utility has managed wastewater outfall construction projects before, the Brightwater outfall marks the first time a design-build procurement process was used.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results