News
the dam was built on the Euphrates River in the 1980s as part of Turkey’s sweeping Southeastern Anatolia Project to generate electricity, bolster the region’s economy, and irrigate rural areas.
Water has emerged as a new front for power and leverage in a region already burdened by war, political instability, and ...
Habitat International, 22(4), pp. 477–485. DOI: 10.1016/S0197-3975(98)00027-7 Republic of Turkey Prime Ministry Southeastern Anatolia Project Regional Development Administration (1994) Basic ...
The ancient city of Hasankeyf, built on and around the banks of the river in southeastern Turkey, may be one of ... link between Central Asia and Anatolia. "About 200 different sites will be ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results